Structured cabling
Coordinate copper, fibre, containment routes, floor boxes and testing requirements with the fit out programme.

Workplace Technology Integration
MJPM coordinates office technology integration in Hong Kong, bringing IT infrastructure, AV, meeting rooms, access control and smart workplace systems into the office from the start.
Designed Around Your Business
Meeting technology, structured cabling, security and network infrastructure are not independent add-ons. Their locations, power, containment, cooling, acoustics and user experience all affect the interior design and construction programme.
MJPM brings those decisions into the workplace conversation early, helping the physical office and its digital systems work together from the day your team moves in.




What MJPM Brings Together
Coordinate copper, fibre, containment routes, floor boxes and testing requirements with the fit out programme.
Plan rack areas, power, cooling, access control, fire services interfaces and maintainable layouts.
Integrate boardroom, town hall, huddle room and hybrid meeting technology with room design.
Coordinate displays, cameras, microphones, control interfaces, acoustic needs and user experience.
Align security devices, cabling, power, mounting and monitoring requirements with construction details.
Plan occupancy, energy or monitoring sensors where they support workplace operations.
Support move planning, labelling, testing, cutover coordination and post-move validation.
Built On Reliability

The strongest technology is felt rather than noticed. MJPM coordinates the infrastructure behind meetings, collaboration, security and connectivity so each system has a practical place within the architecture, the programme and the way people use the office.
The MJPM Method

Clarify IT standards, security needs, device strategy, network requirements and operational constraints.
Coordinate technology requirements with interior layouts, ceilings, furniture, power and acoustic decisions.
Align AV vendors, MSPs, security contractors, cabling teams and fit out sequencing.
Review landlord, building management and services interfaces that affect installation.
Coordinate first fix, device installation, rack works, testing and documentation.
Support validation, user readiness, handover records and issue follow-up before occupation.
Useful Questions
Workplace technology integration brings systems such as structured cabling, meeting room AV, displays, cameras, access control, CCTV, network infrastructure and selected smart office devices into the office design and fit out process. The aim is to coordinate the physical and technical requirements so systems are properly located, powered, tested and ready for use.
Planning early helps avoid late changes to ceiling layouts, joinery, power, containment, acoustics and furniture. It also gives the IT team, AV vendors and workplace designers a clearer route to coordinate their requirements before the office is built and access becomes more restricted.
Yes. MJPM can coordinate with internal IT teams, managed service providers, AV specialists, security contractors and client-appointed vendors. Day-to-day IT support remains the responsibility of the client or its appointed provider, while MJPM focuses on the project coordination and built-environment integration.
The scope can include structured copper or fibre cabling, server-room fit out, rack areas, power and cooling coordination, AV and video conferencing, meeting-room controls, access control, CCTV, digital signage and selected workplace sensors. The appropriate package depends on your operational requirements and the vendors already appointed.
Technology requirements are reviewed alongside layouts, ceilings, furniture, electrical works, acoustics and programme sequencing. MJPM helps align first-fix infrastructure, device installation, testing, vendor access and commissioning so systems can be validated before the office is occupied.
Where the workplace is occupied, MJPM can review phasing, access windows, protection, cutover planning and testing requirements with the relevant teams. The final approach depends on the systems involved, building rules and the acceptable level of operational risk for the client.
The MJPM Workplace Lifecycle
From the first brief and fit out to maintenance, technology and lease-end handover.
Strategy, space planning and design-led delivery.
Explore Office Interior Design →Turn approved design into a controlled workplace build.
Explore Office Fit Out And Construction →Keep scope, programme and decisions clearly connected.
Explore Office Project Management →Keep the workplace working well after handover.
Explore Office Maintenance →Manage lease-end works and landlord handover with care.
Explore Office Reinstatement →Bring AV, IT and infrastructure into the space early.
This Service
Start A Conversation
Talk to MJPM about the systems, vendors and spatial decisions that need to work together from day one.
Discuss Your Workplace →